Community Service - Site Visit

Updated: Feb 20, 2020

---------------------------------1/6/2019 (sat)-----------------------------------

FIRST trip

Only 9 students coming and doing too many works on site whereas originally there are 30students allocated to this group.

They cleaned the interior space, washed the floor, moved all the furniture.



---------------------------------8/6/2019 (sat)------------------------------------

SECOND trip

Only 5 students (flooring)

1. Floor Cleaning using acid to kill germ and bacteria.

2. Remove all small stone or sand on floor.

3. Apply 1st layer epoxy and let it dry. It take 1-2 hour base on weather.

We need to apply three layer.

Once the third layer applied, we done our part.


----------------------------------13/6/2019 (Thu)---------------------------------

MEETING for let us know the situation of the site and arranged the works/ transportation/ tools and more.

I am wall subgroup.

what to do :

1. check the wall whether it should be cleaned first or not

2. if clean then directly 5 people paint the base color (light green)

3. 5-6 people draw the cactus/ 2 people arrange the work( like who paint what color)

4. (paint cactus base color)

5. overlapping cactus color (with different colors)


---------------------------------15/6/2019 (sat)-----------------------------------

THIRD group - is my turn !!! I am excited to paint the wall.

this time have 22 students went to the site.

Total numbers of students went,

Group 1: 8

Group 2: 13

Group 3: 22

Group 4: 3

Group 5: 8

Group 6: 3

We met at 9am in Taylors and reached that about 11am. The distance is quite far, but it is fun in the car haha.




They started to prepare the tools and paint.

Finished the first and second layer, i touch up some of the corner.


---------LUNCH TIME 1:30PM--------

The drawing group start to drawing the layout of the cactus.

After that, we started to colour the wall.


5:45PM We finished the mural painting.

Thus, I help others to paint the door ( in white n blue) and arrange the book shelf.


Almost 7:20pm, wall subgroup finished everything and we started to clean the rubbish. We left at 7:50pm.